OEE Quick-Check
AAvailability
87.5%PPerformance
83.3%Max units possible if machine never slowed down.
QQuality
95.0%3-Step Guide to Your OEE Report
Enter Planned Time
Input your total shift duration, excluding planned breaks or downtime. This sets your baseline for Availability.
Input Output Data
Provide the number of units you actually produced vs. what the machine is capable of at its ideal run rate.
Identify Loss Factors
View your OEE instantly. Use the breakdown to see if your losses are technical (Availability), speed-related (Performance), or quality-driven.
Frequently Asked Questions
What is a good OEE score?
In the manufacturing industry, 85% is considered world-class. However, most facilities operate between 40% and 60%. The goal is consistent improvement, not just hitting a number.
How often should I check OEE?
Daily or shift-based checks are best for floor managers. Real-time tracking is ideal for identifying hidden losses that manual checks might miss.
How do I calculate Availability?
Availability is simply Actual Run Time / Planned Production Time. It accounts for all planned and unplanned downtime events.
Upgrade to Automation
Tired of typing these numbers every shift? MikroMES tracks your OEE automatically while you work, giving you real-time visibility without the manual effort.
"Complexity kills. Simplicity scales." — The MikroMES Philosophy
Manufacturing Toolkit
Now that you know your OEE, see how much manual tracking is costing you.